On the afternoon of April 29, 2022, the ship "SHENG HANG HUA 1" left China Merchants Jinling Shipyard and successfully completed the trial voyage.
The ship is mainly designed for loading IMO (International Maritime Organization) II chemicals and refined oil with flash point ≤60℃. The ship was designed to load Propylene oxide (oxidized Propylene oxide), MDI (Diphenylmethane diisocyanate), TDI (Toluene diisocyanate). The load capacity at design draft is about 7450 tons. The hull structure is designed in accordance with all cargo tanks and sewage tanks, which can be loaded with chemicals, refined oil and other goods.