Path: Home > News > Corporate News

Newly-built Ship "SHENG HANG HUA 1" Successfully on Trial
日期:2022年04月29日    来源:部门

On the afternoon of April 29, 2022, the ship "SHENG HANG HUA 1" left China Merchants Jinling Shipyard and successfully completed the trial voyage. 


图片9.png


图片10.png


The ship is mainly designed for loading IMO (International Maritime Organization) II chemicals and refined oil with flash point ≤60℃. The ship was designed to load Propylene oxide (oxidized Propylene oxide), MDI (Diphenylmethane diisocyanate), TDI (Toluene diisocyanate). The load capacity at design draft is about 7450 tons. The hull structure is designed in accordance with all cargo tanks and sewage tanks, which can be loaded with chemicals, refined oil and other goods.